Acid fracturing is a drilling technique used to break open carbonate reservoirs to access natural gas and crude oil reserves. The procedure involves injecting a fluid, usually hydrochloric acid, into a fracture to cause a chemical reaction that dissolves portions of the fracture face.
You can control the amount of acid that is injected into the fracture by controlling factors like injection speed, reservoir temperature, and viscosity. It is important to leave a rough fracture surface which remains conductive for the reservoir fluids after the fracture closes.
Acid frac hose characteristics
Acid fracturing is a well stimulation process in which water-based fluids with propping agents are pumped into a reservoir to create fractures. These fractures increase the rate of gas and hydrocarbons flowing from the wellbore.
The treatment involves two steps. First, the pad fluid is injected to create the desired dimensions of the fracture. Then, acid is pumped down the fracture walls to etch them.
This enables the formation of wide fractures that allow more gas and fluid to pass through them. This improves the overall productivity of your well.
However, it is important to note that acid fracturing can also result in a high level of leakoff from the fractures, which can cause production problems later on. It is important to use a fluid loss additive in the pad fluid.
This problem can be avoided by designing the fracturing process to maximize fracture conductivity. This can be done by adjusting the amount of acid injected and choosing the correct type of propping agent.
For example, if the fracture conductivity is to be increased by 80%, it is necessary to inject a large dose of authigenic acid and a small amount of gelling acid. This alternating injection technique can significantly improve the performance of acid-etched fractures and reduce the occurrence of leak-off from the fracking fluid.
ways to acidize frac hose to extend life
The most common causes of hose failure include kinking, corrosive chemical, abrasion, and thermal expansion. To avoid premature hose failure a thorough hose inspection program is a must. To increase productivity, workers can be encouraged to take the time to identify hose weaknesses and prioritize repair and replacement accordingly. Supervisors and members of the hazmat committee should also provide guidance to their workers on how to accomplish this task.
Establishing a maintenance schedule for your hose is the most important part of hose replacement. Make sure you communicate it to your crew. This is especially important if you are operating in remote areas. It can be difficult to find qualified personnel to help you. Similarly, it may be beneficial to designate a team member to oversee the maintenance activities on a daily basis.
Acid fracturing hose wire fault
In hydraulic fracturing, a range of fluids is pumped into rock formations to create fractures that open up and release oil and gas. Acid is one example of such fluids.
When designing acid fracturing treatments, the design engineer is concerned with creating wide fractures with minimal leakoff, using viscous fluids. The pH of the acid is important as the higher the pH, the faster the reaction between the acid and the carbonate formation occurs.
Also, the treatment should be designed to increase fracture conductivity in carbonate formations. This is done by ensuring that acid penetrates to the carbonate. The acid-penetration distance is the distance at which acid penetrates the fracture.
Increasing the acid penetration distance is critical for a successful acid fracture treatment in a carbonate reservoir, but this can be difficult to accomplish, particularly in ultradeep gas reservoirs with very high temperatures.
In most cases, the acid is pumped down the fracture with water-based pad fluid to form fracture dimensions that are wide enough and long enough for the desired conductivity to be achieved. To etch the fracture, the acid is pumped down the fracture.